Note: Many products are not yet listed. Please contact us for more product information. Our supply channels are constantly expanding, and we currently have 20 stable shared supply channels. Please confirm the model, product, price, and all other necessary information with customer service before placing an order. We offer new, refurbished, and used products, and prices are adjusted according to the year of the item you require.
Product Introduction
When your industrial or utility power distribution system needs ultra-reliable high-precision power quality monitoring and basic feeder protection performance to ensure the stable operation of critical power loads, this device acts as the core power system monitoring and protection hub.
It supports full three-phase electrical parameter measurement, covering voltage, current, power, energy, power factor, frequency and total harmonic distortion (THD), and can analyze up to the 32nd order harmonic. Its built-in waveform capture and sequence-of-events (SOE) logging functions can accurately record power system fault processes, helping maintenance teams quickly locate fault causes. It supports multiple standard industrial communication protocols, enabling seamless interconnection with upper-level SCADA and building management systems.

PQMII-T20

PQMII-T20

PQMII-T20
Key Technical Specifications
| Parameter | Value |
|---|---|
| Part Number | PQMII-T20 |
| Product Type | Power Quality Meter & Feeder Protection Relay |
| Manufacturer | GE Multilin (GE Vernova Grid Solutions) |
| Three-Phase Voltage Input | 100–480 VAC (up to 600V AC direct, higher with external PT) |
| Current Input | 1 A / 5 A secondary CT inputs |
| Operating Frequency | 50/60 Hz |
| Measurement Accuracy | ±0.2% for voltage/current; ±0.4% for power/energy |
| Harmonic Analysis Range | Up to 32nd order harmonic |
| Analog I/O | 1×4–20mA input, 4×isolated analog outputs |
| Digital I/O | 4×digital switch inputs, 4×programmable output relays |
| Protection Functions | Over/under voltage, overcurrent, phase unbalance, load shedding control |
| Communication Protocols | Modbus RTU, Modbus TCP/IP, Ethernet, DNP 3.0 |
| Data Logging | 1MB internal non-volatile memory, waveform capture & SOE logging |
| Control Power Supply | 20–60 VDC / 20–48 VAC (or 90–300V AC / 70–250V DC universal high version) |
| Installation Method | Panel mount or DIN-rail mount |
| Ports | 2×rear RS-485, 1×front RS-232 |
| Net Weight | ~2.27 kg (5 lbs) |
| Optional Feature | Conformal coating for harsh industrial environments |
Field Application & Technical Pitfalls
Critical Industrial Scenarios
- **Large Manufacturing Plant Power Distribution Monitoring: Acts as the core power quality monitoring unit for the main power distribution room of large manufacturing plants, continuously tracking power quality parameters, identifying harmonic pollution sources, and ensuring the stable power supply of precision production equipment.
- **Utility Substation Feeder Protection: Delivers reliable feeder protection and power quality recording performance for small and medium-sized utility substations, supporting fault waveform capture, helping power grid operation teams quickly locate and eliminate distribution network faults.
- **Data Center Power System Monitoring: Adapts to high-reliability requirements of data center power supply systems, providing real-time power quality monitoring for UPS and precision power distribution loops, preventing IT equipment downtime caused by power quality anomalies.
Non-Negotiable Technical Pitfalls
- ⚠️ Bold Warning 1: Never directly connect 690VAC three-phase line voltage to the voltage input terminals without using an external potential transformer. The internal voltage sampling circuit will experience permanent overvoltage burnout.
- ⚠️ Bold Warning 2: Skipping the pre-commissioning full CT/PT ratio parameter verification will leave you with hidden measurement deviation. This unit must confirm the CT/PT ratio settings fully match the field transformers to ensure measurement accuracy.
- ⚠️ Bold Warning 3: Do not arbitrarily enable overcurrent protection functions without coordinating with the upper-level distribution protection settings. Unreasonable protection setting values will cause unnecessary tripping of the distribution feeder.
A large semiconductor manufacturing plant maintenance team once swapped a PQMII-T20 device and skipped the CT ratio verification. The hidden mismatched CT ratio caused the power measurement value to deviate by 20%, resulting in the plant’s power energy management system generating completely wrong statistical data.
Quality Control (QC) SOP & Transparency
- Inbound Verification: Cross-check the OEM serial number against GE Multilin’s official PQMII series part registry, confirm the part number PQMII-T20 matches the factory label, and inspect no damage or deformation on all wiring terminals and communication ports.
- Live Rig Testing: Power the unit in a calibrated GE power meter test bench, apply standard three-phase test voltage and current, and confirm full 2-hour continuous stable measurement operation.
- Parameter Testing: Verify all electrical parameter measurement accuracy meets factory specifications, confirm all communication protocols and protection functions trigger correctly, and validate all status LED indicators function properly.
- Final QA & Packaging: Seal the tested device in a static-shielding anti-static bag, attach a unique QC passed serial label, and nest it in foam padding inside a rigid industrial shipping carton.
Frequently Asked Questions (FAQ)
- Can I hot-swap the communication wiring while the device is running? Yes, but you must first confirm that the corresponding communication port is not in active data transmission, otherwise you will trigger temporary SCADA communication interruption alarms.
- What exact systems is this device compatible with? It works natively with GE Multilin PQMII series supporting systems, and can seamlessly connect to standard Modbus/DNP 3.0 protocol SCADA and BMS platforms.
- How long is the standard warranty for this new surplus unit? 12 months from delivery. It covers all manufacturing defects, but does not extend to units damaged by overvoltage, miswiring, or improper protection setting in the field.
- How do I tell a genuine OEM unit apart from a refurbished clone? Genuine GE PQMII-T20 devices have a laser-etched part number on the housing, not a printed sticker. Clone units almost always fail the ±0.2% high-precision voltage/current measurement test.
- What is the typical lead time for shipment? In-stock units ship within 48 hours. If you require official GE Multilin factory calibration test documentation, add 2 extra business days to the turnaround window.
- Can this device replace the older PQM legacy power quality meter unit? Well, technically it supports the same DIN rail/panel installation dimensions, but you will need to reconfigure the communication point table in the SCADA system to ensure full data interconnection.