Sale!

GE SR489-P5-LO-A20-E | 5A Generator Management Relay

Original price was: 8.500,00 ر.س.Current price is: 6.500,00 ر.س.

  • Model: SR489-P5-LO-A20-E
  • Brand: GE Multilin
  • Series: 489 Generator Protection System
  • Core Function: Provides generator protection, electrical monitoring, fault detection, and trip control.
  • Category: Generator management and protection relay
  • Key Specs: 5 A phase current transformer inputs, low-voltage auxiliary supply, 4–20 mA analog outputs, generator protection functions, and event recording.
  • Availability & Condition: Contact us to confirm current stock, condition, and accessory availability.

Description

Note: Many products are not yet listed. Please contact us for more product information. Our supply channels are constantly expanding, and we currently have 20 stable shared supply channels. Please confirm the model, product, price, and all other necessary information with customer service before placing an order. We offer new, refurbished, and used products, and prices are adjusted according to the year of the item you require.

 

Key Technical Specifications

Parameter Specification
Manufacturer GE Multilin
Model SR489-P5-LO-A20-E
Product Type Generator management and protection relay
Product Series 489 Generator Protection System
Phase Current Input 5 A CT secondary
Auxiliary DC Supply 24–60 V DC
Auxiliary AC Supply 20–48 V AC, 48–62 Hz
Analog Output Configuration 4–20 mA
Analog Output Channels Eight 4–20 mA outputs, according to published product references
Generator Applications Synchronous and induction generators
Protection Functions Differential, overcurrent, ground fault, reverse power, loss of excitation, over/underfrequency, and thermal protection
Temperature Monitoring 12 RTD inputs
Analog Transducer Inputs 4 inputs for applications such as vibration monitoring
Communication Interfaces RS-232 and RS-485; Ethernet availability depends on the ordered configuration
Communication Protocols Modbus RTU, Modbus TCP/IP, and DNP 3.0, subject to interface configuration
Event Recording Up to 256 time-tagged events
Oscillography 12 samples per cycle, up to 128 cycles
Mounting Design Draw-out relay construction

Specifications are based on GE Vernova’s 489 product brochure and published ordering information. Confirm the exact nameplate, output configuration, and communication options before ordering.

 

Product Introduction (Anti-Template)

When generator faults threaten equipment integrity or power continuity, the GE Multilin SR489-P5-LO-A20-E provides dedicated protection, monitoring, and trip-control functions for synchronous and induction generators. The relay supports protection against stator faults, overcurrent, ground faults, loss of excitation, reverse power, abnormal frequency, and thermal overload. Its measurement and recording functions also help maintenance teams review operating conditions and investigate protection events.

The P5 configuration is designed for 5 A phase CT secondaries, while the LO power-supply option accepts 24–60 V DC or 20–48 V AC. The A20 suffix identifies the 4–20 mA analog-output configuration. These suffixes matter when replacing an installed relay: a unit with a different CT input or auxiliary supply may not be suitable, even if it belongs to the same 489 family. GE Vernova lists the 489 as a legacy product whose manufacturing has been discontinued, with the Multilin 889 identified as an alternative.

SR489-P5-LO-A20-E

SR489-P5-LO-A20-E

SR489-P5-LO-A20-E

SR489-P5-LO-A20-E

SR489-P5-LO-A20-E

SR489-P5-LO-A20-E

SR489-P5-LO-A20-E

SR489-P5-LO-A20-E

SR489-P5-LO-A20-E

SR489-P5-LO-A20-E

QC, Procurement & Logistics SOP

  1. Inbound Verification: Inspect the nameplate, full model number, serial number, front display, terminal blocks, draw-out mechanism, and housing. Verify the P5, LO, and A20 configuration against the customer’s required specification.
  2. Live Rig Testing: Where suitable test equipment is available, check power-up behavior, display and keypad operation, diagnostic status, and accessible communication functions. Protection testing should use an appropriate secondary-injection setup and the approved test procedure. Confirm the actual test scope before purchase.
  3. QA & Anti-Static Packaging: Inspect terminals, connectors, and the relay case for damage or corrosion. Use suitable ESD-protective packaging and secure cushioning to protect the electronics and draw-out assembly during transit.
  4. Global Logistics & Export Compliance: Confirm the destination, required shipping documents, and applicable HS classification before dispatch. Arrange appropriate protective packaging for air or sea freight and provide tracking details when available.

 

Technical Pitfalls & Integration Warnings

  1. Firmware and Configuration Compatibility: Verify the relay’s firmware, configuration software compatibility, and existing protection settings before replacement. A hypothetical change from firmware V2.8 to V3.1 could require additional checks if configuration requirements differ; these versions are illustrative, not a confirmed firmware history for this model. Never assume that a replacement relay will automatically retain the original settings.
  2. CT Ratio and Input Configuration: The P5 suffix specifies 5 A phase CT secondaries. Confirm the installed CT secondary rating and the relay’s configured CT ratios before commissioning. Incorrect CT configuration can produce misleading measurements or incorrect protection operation.
  3. Auxiliary Power and Analog Output Compatibility: The LO suffix specifies a low-voltage supply range, while A20 identifies 4–20 mA analog outputs. Verify the available control supply, output wiring, receiving-device input ranges, and configured scaling. Do not substitute a HI power-supply version or a different analog-output variant without confirming system compatibility.
  4. ESD, Draw-Out Handling, and Live-System Safety: Use appropriate ESD precautions when handling the relay. Before withdrawing or inserting the unit, follow the manufacturer’s procedure and the plant’s electrical safety requirements. A draw-out design simplifies maintenance but does not, by itself, establish that removal under energized conditions is safe or permitted.

 

Frequently Asked Questions (FAQ)

Q1: What is the GE Multilin SR489-P5-LO-A20-E used for?

It is a generator protection and management relay used to monitor generator operating conditions, detect electrical faults, and initiate configured alarms or trip actions.

Q2: What do P5, LO, and A20 mean?

  • P5: 5 A phase CT secondary input.
  • LO: Low-voltage auxiliary supply, rated 24–60 V DC or 20–48 V AC at 48–62 Hz.
  • A20: 4–20 mA analog outputs.

These suffixes identify important configuration differences and should be checked against the installed unit.

Q3: Is the SR489-P5-LO-A20-E still manufactured by GE?

GE Vernova identifies the Multilin 489 as a legacy product and states that manufacturing has been discontinued. The Multilin 889 is identified as an alternative. A proposed replacement must still be evaluated for protection functions, wiring, configuration, and commissioning requirements.

Q4: Can the SR489-P5-LO-A20-E be replaced by a Multilin 889?

Potentially, but it should not be treated as a direct plug-in replacement without engineering review. Check CT and VT wiring, trip and alarm contacts, analog outputs, communication interfaces, protection settings, and panel installation requirements before planning a retrofit.

Q5: Can this relay be hot-swapped?

Do not assume that it can be withdrawn safely while energized. Although the 489 uses a draw-out construction, the permitted maintenance procedure depends on the installation and applicable safety requirements. Follow the manufacturer’s instructions and plant isolation procedures.

Q6: What is the typical international delivery time?

Delivery depends on confirmed stock, condition, testing requirements, destination, and shipping method. Request a quotation with a confirmed lead time and dispatch estimate.

Q7: What shipping and customs documents can be provided?

Available documentation depends on the destination and order requirements. Confirm the commercial invoice, packing list, tracking information, and any requested certificate documentation before dispatch.

zyq xuanchuance